Block and Beam
Location: Dauntsey
Contract Duration: 6 weeks
Our customer wanted to build a new house near his existing property in Dauntsey Wiltshire.
The project required us to level the whole area and dig out foundation trenches.
The area then was prepared for a block and beam floor. Associated drainage was done at the same time.
Service trenches added later.